§ 44-164. Application for water tap permit; calculation of the system development fee.  


Latest version.
  • (a)

    An application for a water tap permit shall be filed at the time of application for a single-family or duplex building permit or at the time of site plan submission for projects for which site plan approval is required.

    (b)

    System development fees are calculated based on the daily wastewater design flow rates for each proposed land use in accordance with the schedule established by North Carolina Administrative Code Section 15A, NCAC 02T.0114. The system development fee shall equal $1.77 per gallon per day. For single-family dwellings, the flow rate shall equal 120 gallons per bedroom per day. The minimum flow rate for a single-family dwelling shall be 240 gallons per day. Each additional bedroom above two bedrooms shall increase the volume by 120 gallons per day. For other land uses, refer to the schedule for each type of establishment as outlined in 15A, NCAC 02T.0114.

(Ord. No. 18-07-010 , Pt. I, 7-5-2018)